Project Description

Our team removed and replaced a concrete ramp as part of the infrastructure improvements for a new shipping and receiving door.

The concrete pavement surrounding the existing ramp was crumbling, cracking, and posed a potential fall hazard while working on the ramp and was becoming unsafe for forklift traffic.

We removed the existing pavement and replaced it with roughly 17 SY of 8” concrete. We formed and poured a retaining wall (max height 8’), 1’x5’x40’ footing, and backfilled with 6” of roadstone.  The installation of 40’ of primed guardrail ensured the safety of the workers and the traffic.